Home
Up
Installation requirements
Redring Electric showers
New Team Electric Shower Range
New Team Comfort Extended Riser
New Team Comfort Grab Rail

NewTeam Electric Showers

 

NT Installation Requirements

Each NewTeam shower is supplied with a comprehensive illustrated manual, which takes you through each stage of the installation process.

NewTeam electric showers must be installed to a mains cold water supply with a minimum running pressure of 1.0 bar (14.5 psi).

These showers are equally at home over a bath or in a shower enclosure and can be mounted easily to the wall using standard fixings.

 

 

The schematic drawing shows the basic recommended water and electrical connection requirements. A separate and permanently connected cable must be taken from the consumer unit directly to the shower via a double pole isolating switch. The installation must be in compliance with the latest IEE wiring regulations.

 

Products

About Us Contact Us Ordering Order Form FAQ Spares Special Offers Technical Installers Terms

www.showerright.co.uk , www.ifskitchens.co.uk , www.fossie.com and www.gasapplianceguide.co.uk are owned and operated by IFS (Portsmouth) Ltd.